FREE TEMPLATE · RAMS · CONSTRUCTION

A free method statement and RAMS template, written by people who've stood on site.

A method statement sets out how a job will be done safely, step by step, in the right order. On most construction work you'll be asked for it alongside a risk assessment, and the two together are RAMS. This page explains what each part has to contain, and gives you a free construction template to start from.

A free method statement and RAMS template,
FeatureGrid
METHOD STATEMENT VS RISK ASSESSMENT

Two documents, one purpose. People mix them up, so here's the difference.

A principal contractor or client asks for RAMS because they need to see both: that you understand the risks, and that you've planned the work to manage them. A method statement with no risk assessment behind it is just a plan with no safety logic. A risk assessment with no method statement leaves the actual sequence of work unexplained.

The risk assessment

Answers "what could go wrong here, and what do we do about it?" It lists the hazards, who's at risk, and the control measures that keep them safe.

The method statement

Answers "how do we do this job safely from start to finish?" It's a sequence: the steps, the equipment, the people, and the controls applied at each stage.

RAMS, the pair

Risk Assessment and Method Statement together. On most construction jobs you'll be asked for both as a pair, not a method statement on its own.

FeatureGrid
WHAT A METHOD STATEMENT MUST INCLUDE

What a usable method statement covers.

The sequence of work is the heart of it, but a method statement a principal contractor will accept covers all of this:

Project and site details

Who's doing the work, where, and what the job is.

Scope of work

A clear description of the task the statement covers.

The sequence of work

The steps, in order, with the safe method for each. This is the heart of it.

Plant, equipment and materials

What's being used, and any specific safety requirements that go with it.

Site-specific controls

Permits, exclusion zones, traffic management and working-at-height arrangements: the things that depend on this particular site.

PPE and RPE

What's required, by whom, and at which stage of the work.

People and competence

Who's doing the work, their roles, and the training or tickets they need to do it.

Emergency arrangements

First aid, raising the alarm, and what to do if something goes wrong on site.

Sign-off and briefing

Evidence the operatives were briefed and understood the method before they started.

ImageFeature
THE TEMPLATE GETS YOU THE STRUCTURE

The template gets you the structure. Your site gets you the risk.

The free template gives you a sound, professional layout that a principal contractor will recognise. What it can't do is write the safe sequence for your actual task on your actual site. Generic RAMS get rejected at the gate, or worse, they get accepted and then bear no relation to how the work really happens, which is exactly where people get hurt. Good RAMS describe the job in front of you: this scaffold, this excavation, this lift, this access constraint. That's the part that takes a site-literate eye.

A professional layout a principal contractor will recognise, ready to fill in
Generic RAMS get rejected at the gate; site-specific RAMS get accepted
The safe sequence for this scaffold, this excavation, this lift, this access constraint
Book a Free Review
A Spectra consultant reviewing a method statement on a construction site
LeadMagnetPromo

Download the free construction RAMS template.

A sound, professional method statement and risk assessment layout you can build from, recognised by principal contractors. Pop in your name, email and company and it's yours.

StepProcess
WHEN A TEMPLATE ISN'T ENOUGH

A template gets you started. Getting it right is the hard part.

A generic form won't know your site, your sequence or your access constraints. Your named Spectra consultant writes RAMS that stand up when a principal contractor, a client or the HSE asks, written by people who've stood on site.

— STEP 01
Start from the template
Download the layout and fill in your project and site details. It gives you the right structure from the off.
— STEP 02
Describe the actual job
Write the safe sequence for the real task on the real site: your access, your plant, your controls, your people.
— STEP 03
We review or write it
Your consultant prepares or checks the RAMS so they're accurate, site-specific and ready to be accepted.
— STEP 04
It stands up at the gate
RAMS that a principal contractor, a client or the HSE will accept, because they describe the job in front of you.
FaqAccordion
QUESTIONS

Common method statement and RAMS questions

What is the difference between a method statement and RAMS?
A method statement explains how a job will be carried out safely, step by step. RAMS, short for Risk Assessment and Method Statement, is the two documents together: the risk assessment identifies the hazards and controls, and the method statement sets out the safe sequence of work. On most construction jobs you'll be asked for RAMS as a pair, not a method statement alone.
Are RAMS a legal requirement?
There's no single law that says "you must produce a method statement." But the duty to assess and control risk under the Management Regulations and the Construction (Design and Management) Regulations 2015 (CDM) means that for any significant or higher-risk task, written RAMS are the practical way to show you've planned the work safely. Principal contractors and clients routinely require them before you can start on site.
Who writes the method statement?
Whoever is carrying out the work is responsible for producing the RAMS for their task, usually the contractor or subcontractor. It should be written by someone competent who understands both the work and the site. Many firms have a consultant prepare or review their RAMS to make sure they're accurate and will be accepted.
Why do my RAMS keep getting rejected?
Usually because they're too generic. If the method statement describes a textbook version of the task rather than the actual job on the actual site, a principal contractor will send it back. Reviewers want site-specific detail: your access, your sequence, your controls, your people. The fix is to write for the job in front of you, or have someone site-literate do it.
Do I need a separate method statement for every job?
For different tasks, sites or significant risks, yes. A method statement is meant to describe a specific piece of work, so reusing one across jobs that differ in any meaningful way defeats the point and tends to get them rejected. You can build from a template, but the content should reflect each job.
LeadMagnetPromo
Free download: the Workplace H&S Risk Assessment template

The risk assessment that sits behind your method statements — twelve hazards, HSE scoring, a worked example. Free 30-minute review.

CtaBand

A template gets you started. Getting it right is the hard part.

Book a free review and we'll tell you what's missing. Your named Spectra consultant writes RAMS that stand up when a principal contractor, a client or the HSE asks, written by people who've stood on site.

Book a Free Compliance Review